Rotor distance 255 to 280 mm

Rotor distance is the distance between the main rotor axis and the tail rotor axis of the desired fuselage.
Your mechanics have this distance between the axes (if possible the motors) as well. Suitable are mostly fuselages with the same or a slightly larger rotor distance.
 

More sub categories:

Show 61 to 90 (of in total 262 products)
EC 145 - radar - 1:24
Shipping time: 5-10 days
13,00 EUR
19 % VAT incl. excl. Shipping costs
UH-60 - Attachments radar nose
Shipping time: 5-20 days
5,00 EUR
19 % VAT incl. excl. Shipping costs
Tail rotor two-blade 84 mm (EC 145)
Shipping time: 5-20 days
6,00 EUR
19 % VAT incl. excl. Shipping costs
UH-60 - Attachments refuelling probe
Shipping time: 5-20 days
9,00 EUR
19 % VAT incl. excl. Shipping costs
UH-60 - motor winch
Shipping time: 5-10 days
6,00 EUR
19 % VAT incl. excl. Shipping costs
EC 145 - bow nose - 1:24
Shipping time: 5-10 days
2,50 EUR
19 % VAT incl. excl. Shipping costs
Tail rotor four-blade 96 mm (UH-60)
Shipping time: 5-20 days
10,00 EUR
19 % VAT incl. excl. Shipping costs
Bo 105 P1-A1 - Attachment TAH
Shipping time: 5-20 days
16,00 EUR
19 % VAT incl. excl. Shipping costs
Tail rotor two-blade 80 mm left (UH-1)
Shipping time: 5-10 days
7,00 EUR
19 % VAT incl. excl. Shipping costs
Bo 105 P1-A1 - Attachment optic tower TOW
Shipping time: 5-20 days
4,00 EUR
19 % VAT incl. excl. Shipping costs
EC 145 - Landing gear 1 - 1:24
Shipping time: 5-20 days
23,00 EUR
19 % VAT incl. excl. Shipping costs
Tail rotor two-blade 80 mm right (UH-1)
Shipping time: 5-10 days
7,00 EUR
19 % VAT incl. excl. Shipping costs
EC 145 - Landing gear 2 - 1:24
Shipping time: 5-20 days
24,00 EUR
19 % VAT incl. excl. Shipping costs
Tail rotor 80 mm left (UH-1) for OMP M2
Shipping time: 5-10 days
7,00 EUR
19 % VAT incl. excl. Shipping costs
EC 145 - Landing gear 3 - 1:24
Shipping time: 5-20 days
27,00 EUR
19 % VAT incl. excl. Shipping costs
Tail rotor 80 mm right (UH-1) for OMP M2
Shipping time: 5-10 days
7,00 EUR
19 % VAT incl. excl. Shipping costs
Bo 105 P1-A1 - Attachments pipes TOW
Shipping time: 5-20 days
20,00 EUR
19 % VAT incl. excl. Shipping costs
EC 145 - Landing gear 4 Police - 1:24
Shipping time: 5-20 days
21,00 EUR
19 % VAT incl. excl. Shipping costs
EC 145 - Landing gear 5 Benz Style - 1:24
Shipping time: 5-20 days
25,00 EUR
19 % VAT incl. excl. Shipping costs
EC 145 - Landing gear 6 - 1:24
Shipping time: 5-20 days
25,00 EUR
19 % VAT incl. excl. Shipping costs
Tail rotor two-blade 84 mm (Bo 105)
Shipping time: 5-20 days
6,00 EUR
19 % VAT incl. excl. Shipping costs
UH-1D - Landing gear flat - 1:32
Shipping time: 5-20 days
11,00 EUR
19 % VAT incl. excl. Shipping costs
UH-1D - Landing gear medium high - 1:32
Shipping time: 5-20 days
14,00 EUR
19 % VAT incl. excl. Shipping costs
UH-1D - Landing gear most high - 1:32
Shipping time: 5-20 days
15,00 EUR
19 % VAT incl. excl. Shipping costs
Bo 105 - Landing gear 1 standard - 1:24
Shipping time: 5-20 days
20,00 EUR
19 % VAT incl. excl. Shipping costs
Show 61 to 90 (of in total 262 products)
Quick purchase

Please enter the article no. from our catalogue.

Welcome back!
Shipping country